Comments on the Environmental Notification form for the second phase of the Clipper City Rail Trail Phase II in Newburyport and Newbury, MA MEPA# 15191

Comments on the Environmental Notification form for the second phase of the Clipper City Rail Trail Phase II in Newburyport and Newbury, MA MEPA# 15191

May 12, 2014

Richard K. Sullivan, Jr. 
Executive Office of Energy and Environmental Affairs
Attn: Alex Strysky
100 Cambridge St., Suite 900
Boston MA 02114

RE: Comments on the Environmental Notification form for the second phase of the Clipper City Rail Trail Phase II in Newburyport and Newbury, MA MEPA# 15191

Dear Secretary Sullivan:

WalkBoston has reviewed the Environmental Notification Form for the Clipper City Rail Trail Phase II, which calls for a new multi-purpose trail on a 1.5 mile section of former rail property – the old City Branch line – in the eastern part of the city. Phase II will also extend along a significant portion of the Merrimack River waterfront in the city center. This new trail adds to the existing 1.1 mile rail trail (Phase I) which links the MBTA commuter rail station and Merrimack River not far from the center of the city. A later Phase III will join these two segments in the vicinity of the existing commuter rail station south of the city, but not along the Merrimack River.

Our review leads us to offer these comments:

Design the trail for expansion 
The proposal for Phase II includes an 8-10 foot wide path. The right-of-way for the trail is irregular, as it passes through publicly owned land that includes 19.4 acres. With this space, plans should recognize the possibility that the path will need to be widened if it is successful in drawing users. Many rail trails in Massachusetts are 10-12 feet wide, permitting a 5-6 foot path in each direction. For example, an extension of the Bruce Freeman Trail in Acton will provide a 12-foot trail with 2-foot wide shoulders on both sides to allow space for pedestrians to step aside from other users of the path if they feel the need to let them pass (a possibility if bicycles are passing).

Design the rail trail to include runners 
Rail trails are a success in Massachusetts. Concurrent with the growth in use, new paths need to be carefully designed to serve a wide variety of users. Phase II of the Clipper City Rail Trail appears to be a very desirable facility, and it makes sense to design it to accommodate runners who are frequent users of trails. Runners often prefer a softer surface than that favored by cyclists and walkers; stone dust has frequently been used because it is resilient and provides a comfortable running surface.

Phase II of the Clipper City Rail Trail has significant right-of-way space that would allow more than a basic bicycle and pedestrian path. With space available, a parallel running track should be considered for the Trail. Even if such a running track is a future addition to the facility, space for such a track should be preserved for the future. In a state known around the world for the Boston Marathon and the many sponsored running events, runners should be included, along with the walkers and bicyclists who may be the prime users of the proposed facility.

Connecting Phase I and Phase II in the city center 
Plans for connecting Phase I and Phase II of the Trail along the Merrimack River in the waterfront area of Newburyport are not included in this document. Omitting mention of such a potential connection seems to diminish the potential created by Phase II construction. Phase II, paralleling the Merrimack River, terminates at Custom House Way, at a point that appears to be adjacent to a portion of the existing Waterfront Promenade Park. This open space has a seawall and boardwalk that can extend the walk two to three blocks further west. Admittedly, at the western end of Promenade Park, an off-street right-of-way may be difficult to find. Sidewalks may have to be used to pass along these few blocks, but if completed, this connection between Phase I and Phase II would afford a 2.4 mile loop around many of the older portions of the city.

Thank you for the opportunity to comment on this important project.

Sincerely, 

Robert Sloane 
Senior Planner

Clipper City Rail Trail Comment Letter

Clipper City Rail Trail Comment Letter

WalkBoston has reviewed the Environmental Notification Form for the Clipper City Rail Trail Phase II, which calls for a new multi-purpose trail on a 1.5 mile section of former rail property – the old City Branch line – in the eastern part of the city. Phase II will also extend along a significant portion of the Merrimack River waterfront in the city center. This new trail adds to the existing 1.1 mile rail trail (Phase I) which links the MBTA commuter rail station and Merrimack River not far from the center of the city. A later Phase III will join these two segments in the vicinity of the existing commuter rail station south of the city, but not along the Merrimack River.

Read the full letter here:
WalkBoston-CommentENF-ClipperCityRailTrail-Newbury

Riverwalk Redevelopment Lawrence Comment Letter

Riverwalk Redevelopment Lawrence Comment Letter

April 24, 2009

Secretary Ian Bowles
Executive Office of Energy and Environmental Affairs, MEPA Office
100 Cambridge Street, Suite 900
Boston, MA 02114

RE: Comments on the Expanded Environmental Notification Form (EENF) for the Proposed Riverwalk Redevelopment in Lawrence.

EOEA #14389

Dear Secretary Bowles:

Thank you for the opportunity to comment on the Expanded Environmental Notification Form (EENF) for the Proposed Riverwalk Redevelopment in Lawrence. We are pleased to see redevelopment where it can bring significant economic benefits, and especially where it affords the opportunities for new or expanded pedestrian facilities. Our understanding is that the project is looking for a Phase I waiver to allow initial demolition and construction of relatively modest buildings. These initial moves set the stage for the larger Phase II.

Riverwalk is located on the banks of the Merrimack River, but is separated from the river by a strip of land owned privately and occupied principally by a very wide municipal easement, consisting of a large sewer pipe, covered by a wide granite slab. This strip of land has long been planned by the City to be a pedestrian walkway along the Merrimack, and its existing design condition lends itself well to this purpose.

We are concerned that the Riverwalk project may be turning its back on the City’s proposed riverfront pedestrian improvements. The project as shown in this document could be substantially improved to ameliorate this situation. We suggest the following improvements:

  1.  One driveway in the project now occupies much of the waterfront side of this property on the north. This driveway appears to be designed primarily for truck access to one existing building (the Cotton Mill) and one proposed structure (the proposed commercial building of 3 stories.) It will be a lost opportunity if the site’s entire river frontage becomes pavement to serve this truck access. Consideration should be given to relocating most of the truck access further into the site interior. While trucks will continue to need access to the redeveloped Cotton Mill, it is on the east side of the site and can be accommodated by a service road connection that leaves options open for further use of the river frontage of the site.
  2. If truck access were removed from most of the river frontage of the site, more benign pedestrian-oriented use could be made of this advantageous waterfront location. Parkland could be added, and if a large commitment of outdoor space can be made, it can provide amenities for employees and visitors to existing and proposed buildings on a scale that is difficult to find in other cities.
  3. If parkland could be provided along the riverfront, the layout of the site might be reconsidered to focus all of the buildings toward the river, its views and its amenities. In practice this would suggest that pedestrian walkways be added between all the site’s buildings and the water’s edge. For example, walkways across the large parking lot might be provided and emphasized with landscaping to provide a major pedestrian connection between the river and the Wood Mill. We understand that sidewalk access from the Cotton Mill to the river already exists on the east side of the site. River access from all proposed new buildings should also be provided through the use of a sidewalk network that connects to all parts of the site and its buildings. In some cases, this may mean that the sidewalks might have a dedicated right-of-way that is not located alongside a new street.
  4. Where roadways are proposed on the site, they should include sidewalks, and most of the proposal indicates that to be the case. However, along the frontage of the Wood Mill (included in Phase II), no sidewalks are provided. As the project moves into more detailed design, truck and pedestrian access will be clarified. At that point, sidewalks should be provided to the principal entrance on the parking lot side of the Wood Mill.

Thank you for the opportunity to comment on the EENF for the Proposed Riverwalk Redevelopment. Please contact us for any clarification or additional comments that you may need.

Sincerely,

Wendy Landman                               Robert Sloane